Currently Ongoing Projects

    1. FOR 2014-15 Fiscal Year
      • 20″ DIA: 35 MILE PIPE LAYING PROJECT IN MYANMAR (MYAING GALAY-YAE).
      • DRILLING RIG TRANSPORTATION OF PTTEP FROM THILAWAR To PSC-G NATMAUK, MAGWE REGION.
      • TRANSPORTATION OF ABOVE RIG FROM NATMAUK TO TAUNG DWIN GYI.
    2. FOR 201546 Fiscal Year
      • TRANSPORTATION OF 3 UNIT GAS ENGINE DRIVEN GENERATOR SETS, MYANMA PETRO CHEMICAL ENTERPRISE.
      • TRANSPORTATION OF I LOT WELL LOGGING UNIT AND ACCESSORIES FROM YAY BAW MEE TO MANDALAY, SIPC, YANGON.
      • LOGISTIC SUPPLY BASE CONSTRUCTION PROJECT, THILAWA SEZ, BOKSENG CO.,LTD.
      • MOGE CONSTRUCTION WORKS WERE AWARDED AS FOLLOWS:
        • CHAIN LINK FENCING & GATE DOOR AT INSEIN YWAMA CNG STATION.
        • RENOVATION OF 8 NOS. STAFF QUARTER AT VARIOUS CNG STATIONS.
        • CONSTRUCTION OF GUARD WALL 1000’ WITHOUT SHORE PROTECTION AT THAKETA OFFSHORE BASE.
      • FEASIBLE STUDY FOR LNG SUPPLY PIPE LINE ON MADE ISLAND,KYAUK PHYU.
    3. FOR 2016-2017 FISCAL YEAR
      • DRILLING SEISMICS SHORT HOLE IN IOR.7, O-30 METER DEPTH JOINT WITH AGS CO.,LTD.
      • SUPPLY AND PROVIDE CAUSTIC SODA BAGS AND CALCIUM CARBONATE TO MYANMA PETROCHEMICAL ENTERPRISE.
      • NOT SERVICES FOR 10 MILES 20” DIAMETER PE COATED PIPE LINE AT MYAING GALAY-YANGON PIPE LINE, MOGE.
      • SUPPLY AND PROVIDED (1 0000)METER 4”MS ERW PIES,(5000)METER EACH 2”Ø AND 3”ØMS ERW PIPE TO MOGE.
      • 45000 FEET 12 INCH DIAMETER JI UPV PIPES AND 4500 FEET 12 INCH DIAMETER MS PIPES LINE CITY WATER SUPPLY CONSTRUCTION PROJECT, NCDC, NAY PYI TAW.
    4. 2017-2018 FISCAL YEAR
      • 8″ ERW API 5L Grade X-42 MS 3LPE Coated Steel Line Pipe (8,050) MTR, MOGE.
      • 6″ ERW API 5L Grade X-46 MS 3 Layer PE Coated Steel Line Pipe (PSL 2) (1100 Nos) (13283 Meters), EPGE.
      • Seismics Shot Hole Drilling PSC EP4 (Mayar Man + Shwe Taung) Joint Venture With GEO API Co.,Ltd, India & ZTP C0.,Ltd Yangon.
      • Submitted CFT For Provision of site prepairation and construction works to support onshore block MOGE – 3 Exploration Drilling Campaign (Myanmar Asset), PTTEP.
      • Submitted CFT For Mansi Project, Wuntho Resources C0.,Ltd.
      • Supplying for 6″, 10″, 14″ Pipe ERW Steel Line Pipe API 5L Grade B, PSI (3) Itesm, MPPE.
      • Rental of 3 Unit 20 Ton Excavator, 1 Unit Dozer, 3 Unit 40′ High Bed Trailers, 1 Unit Low Bed Trailer.
    5. 2018-2019 FISCAL YEAR
      • GAS PIPE LINE PROJECT IN MYANMAR.
      • CITY WATER SUPPLY PROJECT IN MYANMAR.
      • LOGISTIC SUPPLY TO POWER PROJECTS.
      • SOLAR POWER PROJECT IN MYANMAR.
      • DRILLED SEISMICS SHOT HOLES IN BLOCK RSF – 3 AREA.
      • DESIGN AND CONSTRUCTION OF FUEL TANK FARM PROJECT IN MYANMAR.
    6. 2019-2020 FISCAL YEAR
      • LNG Gas Pipe Line Project In Myanmar.
      • City Water Supply Project In myanmar.
      • Logistic Supply to Inland PSC Drilling Company.
      • Drilling Seismics Shot Hole.
      • Design And Construction Of Fuel Tank Farm Project In Myanmar.
      • NDT, UT, RT Services For Pipe Line Projects.
      • Solar Power Plant Project in Myanmar